COMPANY
AKC Engineering is a company dedicated primarily to the Electric sector, in particular to renewable energy projects. The experience of the company is brought by its 3 founding partners, who have made their professional careers in the electricity sector.
Focused on developing and carrying out EPC solutions (PMGD), design, consultancies and / or electrical consultancies, electrical works inspection, all these services focused for wind, solar, electromobility, minihydro, BESS (Battery Energy Storage System), plants of gas treatments, water treatment plants (desalinators), Offgrid systems.
OURSERVICES
PROJECTS
Los Andes On-Grid Photovoltaic Plant - 21MW
Project executed by Luis Urrejola as Project Manager for AES Gener.
Battery Energy Storage System (BESS)
Project executed by Luis Urrejola as Project Manager for AES Gener.
On-Grid Photovoltaic System - 1.5kW
Domiciliary Project under the Net-Billing Law
On-Grid Photovoltaic System - 1.5kW
Domiciliary Project under the Net-Billing Law
INVESTIGATION AND DEVELOPMENT
Conversion of internal combustion vehicle to electric.
Replacement in a 1959 Chevrolet APACHE truck of its 100 HP internal combustion engine to an electric motor with its consumption and regeneration control system and the smart battery bank.
Conversion of internal combustion motorcycle to electric.
Replacement in a internal combustion engine motorcycle to an electric motor, including its controller and battery pack that contains a load balancing system.
Motorization of skateboards, longboards or similar.
It consists of adding to a skateboard, Longboard or similar vehicles the best solution of electric motor that allows a greater speed and autonomy. The design seeks to find the best solution that avoids damaging the batteries with use and charging.
Conversion of electric stacker with lead batteries to Lithium Ion.
Replacement of the obsolete system of lead batteries to Lithium Ion batteries with an integrated load balancing system and modification of the load limits for the best performance of Lithium.
Design and construction of lightweight vehicles for assisted entertainment
Design of mobility equipment for the people with disabilities, aimed at intertainment based on electric motors. In conjunction with Factoría W we are in the conceptualization stage of an electric skateboard (saddle).
ABOUT US
Luis Hernán Urrejola
CEO
Civil engineer - PUC
Project Director of Electrica Cochrane (540 MW) and Andes Solar (23MWp), Project Manager of Electrica Campiche (272MW) and Construction Manager of Electrica Angamos (540MW), since 1994 developed multiple Power projects (solar, hydro, gas, coal) for AES Gener in Chile, South America and the Caribbean.
Nicolás Martelli
Project Manager
Electrical engineer - USACH
Class A SEC installer, participated in the construction and commissioning of Cochrane with its BESS and Andes Solar and Campiche.